E5.96024.06aManualFeed/Feedback Unit BUC 624, 625
Technical Data10 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH2.1.2 Block diagram
Technical DataFeed/Feed-Back Units BUC 624, 625 11 Baumüller Nürnberg GmbH 5.96024.06a2.2 Electrical data1)Installation height > 1000 m see charact
Technical Data12 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHCharacteristic curve 1: Load in dependence on installation heigh
Technical DataFeed/Feed-Back Units BUC 624, 625 13 Baumüller Nürnberg GmbH 5.96024.06a2.3 Type code
Technical Data14 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH
Transportation, UnpackingFeed/Feed-Back Units BUC 624, 625 15 Baumüller Nürnberg GmbH 5.96024.06a3 TRANSPORTATION, UNPACKINGThe units are packed at th
Transportation, Unpacking16 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH
AssemblyFeed/Feed-Back Units BUC 624, 625 17 Baumüller Nürnberg GmbH 5.96024.06a4 ASSEMBLYWARNINGThe user is responsible for the assembly of the unit
Assembly18 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH4.1 Dimensions
AssemblyFeed/Feed-Back Units BUC 624, 625 19 Baumüller Nürnberg GmbH 5.96024.06a4.2 Assembly informationy Install the units vertically in a switching
Title ManualProduct Feed/Feedback Unit, BUC 624, 625Version 5.96024.06aStatus 2004-12-28Copyright These operating instructions may be copied by the ow
Assembly20 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH4.3 FasteningFasten the unit via the back panel in the switching cabin
InstallationFeed/Feed-Back Units BUC 624, 625 21 Baumüller Nürnberg GmbH 5.96024.06a5 INSTALLATION5.1 Danger informationWARNINGThis equipment carries
Installation22 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH5.2 Standardization informationSeries BUC 6xx are built-in units i
InstallationFeed/Feed-Back Units BUC 624, 625 23 Baumüller Nürnberg GmbH 5.96024.06aNormally, only non-conducting pollutants are produced. When the eq
Installation24 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH5.3 EMC informationGeneral information about convertersModern semi
InstallationFeed/Feed-Back Units BUC 624, 625 25 Baumüller Nürnberg GmbH 5.96024.06aCablingy To suppress radiated noise outside the converter, you sho
Installation26 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHy You achieve the lowest possible effective antenna height by rout
InstallationFeed/Feed-Back Units BUC 624, 625 27 Baumüller Nürnberg GmbH 5.96024.06ay The grounding of reserve wires in cables is mandatory (additiona
Installation28 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHScreeningy The screen is effective against magnetic fields if it i
InstallationFeed/Feed-Back Units BUC 624, 625 29 Baumüller Nürnberg GmbH 5.96024.06ay Proposal for the screen connectionFilteringNo filters are needed
Feed/Feed-Back Units BUC 624, 625 3 Baumüller Nürnberg GmbH 5.96024.06aTABLE OF CONTENTSTable of Contents1 Safety Notes ...
Installation30 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH5.4 BUC 624 connection diagram
InstallationFeed/Feed-Back Units BUC 624, 625 31 Baumüller Nürnberg GmbH 5.96024.06a5.5 Connection diagram BUC 625
Installation32 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH5.5.1 LEDsOnly for internal use, not primarily for the users infor
InstallationFeed/Feed-Back Units BUC 624, 625 33 Baumüller Nürnberg GmbH 5.96024.06aBBint Ready-for-use BUC (for connected BUS units)Accumulative mess
Installation34 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHConnection informationF0 Module fuse (Refer to Accessories, Fuses)
InstallationFeed/Feed-Back Units BUC 624, 625 35 Baumüller Nürnberg GmbH 5.96024.06aNOTEIn the 24-V input, the BUC 62x has capacitors; this means that
Installation36 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH5.6 Pin assignments5.6.1 Power terminalsy 1U1, 1V1, 1W1, PE1U1, 1V
InstallationFeed/Feed-Back Units BUC 624, 625 37 Baumüller Nürnberg GmbH 5.96024.06a5.6.2 Control terminalsy Sub-unit terminal X99A / X99BAll terminal
Installation38 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHy Sub-unit terminal X99ABWARNINGThe allowed maximum current of 10
InstallationFeed/Feed-Back Units BUC 624, 625 39 Baumüller Nürnberg GmbH 5.96024.06a5.7 Accessoriesy Fusesy EMC-packageCan be supplied on request - EM
Abbreviations4 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHABBREVIATIONSAC Alternating currentAM Asynchronous motora.m.s.l. a
Installation40 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH
CommissioningFeed/Feed-Back Units BUC 624, 625 41 Baumüller Nürnberg GmbH 5.96024.06a6 COMMISSIONING6.1 Danger informationWARNINGThis unit carries a d
Commissioning42 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHWARNINGBefore switching on the drive, you must carefully check th
CommissioningFeed/Feed-Back Units BUC 624, 625 43 Baumüller Nürnberg GmbH 5.96024.06a6.2 OperationSwitch-on sequenceFirst of all, auxiliary relay D1 m
Commissioning44 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH6.3 Voltage/phase failurey In the case of a mains failure, the sy
CommissioningFeed/Feed-Back Units BUC 624, 625 45 Baumüller Nürnberg GmbH 5.96024.06ay DC link MonitoringThe level of the DC link voltage is monitored
Commissioning46 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHy Ready for UseThe external Ready for use closes signal contact X
MaintenanceFeed/Feed-Back Units BUC 624, 625 47 Baumüller Nürnberg GmbH 5.96024.06a7 MAINTENANCE7.1 Maintenance informationThis units are maintenance-
Maintenance48 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH7.2 Environmental conditionsIf you keep to the environmental condit
MaintenanceFeed/Feed-Back Units BUC 624, 625 49 Baumüller Nürnberg GmbH 5.96024.06a7.4 DisposalFor the most part, the equipment consists of the follow
Safety NotesFeed/Feed-Back Units BUC 624, 625 5 Baumüller Nürnberg GmbH 5.96024.06a1 SAFETY NOTESIntroductory remarksDuring operation, the principles
Maintenance50 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH
AppendixFeed/Feed-Back Units BUC 624, 625 51 Baumüller Nürnberg GmbH 5.96024.06a8 APPENDIX8.1 Manufacturer DeclarationHERSTELLERERKLÄRUNGIN SINNE DERE
Appendix52 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH8.2 Declaration of ConformityKONFORMITÄTSERKLÄRUNG IM SINNE DEREG-NIED
AppendixFeed/Feed-Back Units BUC 624, 625 53 Baumüller Nürnberg GmbH 5.96024.06a8.3 General Conditions of Sale and Delivery 1. Obligation and Conclu
Appendix54 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHc)In the event of an established material defect or per-formance defec
AppendixFeed/Feed-Back Units BUC 624, 625 55 Baumüller Nürnberg GmbH 5.96024.06aagreed upon with prior written consent from Baumüller. Processing of t
Appendix56 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH8.4 IndexAassembly 17assembly information 19Bblock diagram 10Ccablin
Baumüller Nürnberg GmbH Ostendstraße 80-90 90482 Nürnberg T: +49(0)911-5432-0 F: +49(0)911-5432-130 www.baumueller.deAll information given in this
Safety Notes6 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbHDanger informationIn the context of the operating instructions and
Safety NotesFeed/Feed-Back Units BUC 624, 625 7 Baumüller Nürnberg GmbH 5.96024.06aApplication as directedVoltage testBAUMÜLLER carries out a voltage
Safety Notes8 Feed/Feed-Back Units BUC 624, 625 5.96024.06a Baumüller Nürnberg GmbH
Technical DataFeed/Feed-Back Units BUC 624, 625 9 Baumüller Nürnberg GmbH 5.96024.06a2 TECHNICAL DATA2.1 GeneralThe Feed/Feed back Units designated BU
Kommentare zu diesen Handbüchern