Directed Electronics Automate 210D Betriebsanleitung Seite 10

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 188
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 9
Note to Users of Verified Balances Approved for Use
as Legal Measuring Instruments:
Linearization after Transport
After transport, the linearity and calibration of your
balance may be out of the permissible tolerances
(see the “Specifications”). Always carry out internal
linearization of the balance after transport.
Repeating this procedure – several times, if necessary –
enhances the linearization. This procedure is described
on page 1–35.
Preparing a Verified Balance for Use as a Legal
Measuring Instrument:
After initially connecting the balance to AC power
(or after a relatively long power outage), allow
it to warm up for at least 24 hours.
1–6
Seitenansicht 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 187 188

Kommentare zu diesen Handbüchern

Keine Kommentare