Directed Electronics equalizer 2500 Betriebsanweisung Seite 104

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 154
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 103
Perform a Rapid Run
94
Part # 15035786 Rev. D
Figure 47 Flow Cell Lever in Position 2
5 Make sure that the Vacuum Engaged checkbox is selected on the load sequencing flow
cell screen.
Confirm Proper Flow
1 Select solution 5 (USB) from the drop-down list.
2 Make sure that the following default values are entered:
Volume: 250
Aspirate Rate: 1500
Dispense Rate: 2000
3 Make sure that waste outlet tubes 1, 2, 3, 6, 7, and 8 are in a bottle of clean water and
that tubes 4 and 5 are in the waste container.
4 Select Pump.
5 Visually inspect the flow cell for bubbles passing through the lanes and leaks near the
manifolds.
If excessive bubbles are present, check the manifold gaskets for obstructions, and repeat
the process.
a Select solution 6 (USB) to avoid depleting USB from position 5.
b Reduce the aspirate rate to 1000, and pump another 250 µl of USB to the flow cell.
6 After you have confirmed proper flow, select Next to proceed.
7 Make sure that the flow cell lever is green, and then close the flow cell compartment
door.
Seitenansicht 103
1 2 ... 99 100 101 102 103 104 105 106 107 108 109 ... 153 154

Kommentare zu diesen Handbüchern

Keine Kommentare