Directed Electronics equalizer 2500 Betriebsanweisung Seite 41

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 154
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 40
Load and Prime Reagents
HiSeq 2500 System User Guide
31
Figure 11 Vacuum Hole Locations
Load a Priming Flow Cell
From the Load Priming Flow Cell screen, load a used flow cell for the priming step. After
loading a used flow cell, confirm that the vacuum is engaged.
NOTE
Illumina recommends using the flow cell from a previous run for priming reagents on a
subsequent run or for a post-run instrument wash.
1 Rinse the used flow cell with laboratory-grade water. Dry the flow cell with a lens
cleaning tissue or lint-free tissue.
2 Clean the flow cell using alcohol wipes and lens cleaning tissue.
NOTE
Do not remove or replace the flow cell gaskets during this step.
3 Place the used flow cell on the flow cell holder with the inlet and outlet ports facing
down and the barcode on the right. Make sure that the arrow on the left edge of the
flow cell, which indicates flow direction, points towards the instrument.
4 Gently slide the flow cell towards the top and right guide pins until it stops.
NOTE
Remove your hand from the flow cell before engaging the vacuum switch to prevent
possible alignment drift over time.
Seitenansicht 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 153 154

Kommentare zu diesen Handbüchern

Keine Kommentare