
Perform a Rapid Run
88
Part # 15035786 Rev. D
Figure 40 Flow Cell Lever in Position 1
6 Wait for about 5 seconds, and then slowly move the flow cell lever to position 2 (far-
right). When the flow cell lever is solid green, the manifolds are in position and the
flow cell is ready for use.
Figure 41 Flow Cell Lever in Position 2
7 Enter the flow cell ID.
NOTE
You can use a TruSeq Rapid flow cell or a HiSeq Rapid v2 flow cell for priming.
8 Make sure that the Vacuum Engaged checkbox is selected on the load prime flow cell
screen, and then select Next.
Confirm Proper Flow
After the used flow cell is loaded, check for proper flow. Checking for proper flow confirms
that the flow cell and gaskets are properly installed and the manifold is engaged.
1 Select solution 2 (laboratory-grade water) from the drop-down list.
Kommentare zu diesen Handbüchern