Directed Electronics equalizer 2500 Betriebsanweisung Seite 112

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 154
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 111
Post-Run Procedures
102
Part # 15035786 Rev. D
9 Wearing a new pair of gloves, apply light pressure to 1 side of the front gasket until the
other side lifts. Use tweezers to grasp and remove the gasket. Repeat to remove the rear
gasket.
Figure 49 Remove Used Manifold Gaskets
10 Position a new 10-port gasket in the front manifold and a new 8-port gasket in the rear
manifold.
11 Reload the flow cell.
12 Make sure that the Vacuum Engaged checkbox is selected on the Load Wash Flow Cell
screen.
13 Select Next.
14 Perform a fluidics check:
a Select solution 2 from the drop-down list. Accept the default pump values.
b Select Pump.
c Visually inspect the flow cell for bubbles passing through the lanes and leaks near
the manifolds. Extra bubbles are normal for the Tween 20 and ProClin 300 wash,
and do not affect delivered volume.
15 Remove the 8 waste tubes for the appropriate flow cell from the waste container. Do
not include the 8 tubes for the opposite flow cell, or the tubes from the condensation
pump.
16 [For high output modes] Bundle the 8 waste tubes with parafilm, making sure to keep
all of the tubes even. Place the bundled tube ends into a 250 ml bottle.
Seitenansicht 111
1 2 ... 107 108 109 110 111 112 113 114 115 116 117 ... 153 154

Kommentare zu diesen Handbüchern

Keine Kommentare