Directed Electronics equalizer 2500 Betriebsanweisung Seite 49

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 154
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 48
Load a Flow Cell
HiSeq 2500 System User Guide
39
Figure 21 Flow Cell Lever in Position 2
5 Make sure that the Vacuum Engaged checkbox is selected on the Load Sequencing
Flow Cell screen.
Confirm Proper Flow
Checking for proper flow confirms that the flow cell and gaskets are properly installed and
the manifold is engaged.
1 Select solution 5 from the drop-down list.
2 Enter the following default values:
Volume: 250
Aspirate Rate: 250
Dispense Rate: 2000
3 Select Pump.
4 Visually inspect the flow cell for bubbles passing through the lanes or leaks near the
manifolds.
If excessive bubbles are present, check the manifold gaskets for obstructions and repeat
the process using solution 6 to avoid depleting position 5. Reduce the aspirate rate to
100, and pump another 250 µl to the flow cell.
5 Select Next. Make sure that the flow cell lever is green, and then close the flow cell
compartment door.
6 Confirm that the checkboxes Vacuum Engaged and Door Closed are selected, and then
select Next.
7 Select Start to start the sequencing run.
Seitenansicht 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 153 154

Kommentare zu diesen Handbüchern

Keine Kommentare